PROJECT DATA

Architectural Concrete Finish

Project: Rebuilding and extension of an old bunker with exposed conrete finish

Contractor: AGA Westerwelle Bau GmbH & Co. KG, Germany

MEVA System: Wall formwork Mammut 350 with all-plastic facing alkus

Formwork Engineering: MEVA Formwork Systems, Germany

 
 
1
2
3
4
5
6
 

Project

Old bunker complex being rebuilt and extended to create kitchen studio

Quality results and meeting client demands in terms of scheduling and budgeting are trademarks of contractor AGA Westerwelle from Herford in northern Germany. Expertise and flexibility are part of the company’s quality policy on every construction job. 

Architects are increasingly demanding a high quality finish on concrete that will remain as is after the pour. This was the case with extension and rebuilding works on this old bunker in Bielefeld, Germany. The wall formwork system Mammut 350 was chosen because of its symmetric tie-hole and joint pattern and its standard all- plastic facing alkus, which delivers the desired, smooth concrete finish continuously from the first pour to the last.

“We are very happy with the results!“, say Guido Dahme and his supervisor Alexander Bresel, “We shall definitely be using the Mammut 350 again.”

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

  • Budapest: Playing in the shape sorting box

    Budapest: Playing in the shape sorting box

    Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.