PROJECT DATA

MevaDec wins hands down in phase one of The Lagoons project in Dubai

Project: Phase one of The Lagoons residential and commercial project in Dubai, United Arab Emirates

Contractor: Al Naboodah Construction Group LLC, Dubai, UAE

Principal: Rutter Immobiliengruppe, Vienna, Austria

MEVA system: Slab formwork system MevaDec with early stripping

Engineering and support: MEVA KHK Formwork Systems, Dubai

 
 
1
2
 

Project

Saving time, saving labour

The Lagoons is set to be a signature development within Dubai’s booming property sector, with unique offerings and a strategic location. It will have seven islands, comprising residential units, shopping centres, office buildings and marinas. These detached islands will be interlinked by bridges. Typical for residential projects of this type is the demand for efficiency and speed. The MevaDec hand-set slab system proved once more to be best in class in terms of cost, speed and quality of the slab work. These advantages come from flexibility with filler areas, easy adaptation to building layouts, reduced inventory thanks to early stripping and quick cycles without using a crane. This allows for easy planning, logistics and smooth work flow, thus saving time. In addition to speed, the system delivers a superior, smooth concrete surface thanks to the panel’s all-plastic alkus facing.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Large construction site in the heart of Budapest

    Large construction site in the heart of Budapest

    MEVA fulfils stringent requirements with flexible formwork solutions. The Budapest Zoo & Botanical Garden is one of the Hungary’s most popular cultural attractions.

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.