PROJECT DATA

3-level residential development close to Linz, Austria

Contractor: Jos. Ertl GmbH, Hörsching, Austria

MEVA Systems: Slab system MevaDec, MD props, MD prop head

Formwork engineering: MEVA Formwork Systems, Pfaffstätten, Austria

 
 
1
2
3
4
 

PROJECT

Speedy. Efficient. Simple.

Master of speed in residential projects: MevaDec with just two components

Normally, supervisor Werner Lesterl is a fervent supporter of the drop-head-beam-and-panel method where the panels slide into primary beams. On this large residential project, his employer, contractor Jos. Ertl of Hörschin, Austria, sent him off to try the panel method for the first time. Werner has become a fan of it.

This large 3-level residential development close to Linz in Austria with its regular, repetitive slab layouts prompted MEVA formwork engineers to suggest the panel method as a cost-effective and very fast solution. The panels are directly supported by the prop heads, no beams are needed. This offers many advantages whenever early stripping brings no benefit to work flow or scheduling. One of them is exceptional speed in assembly with just two system components: panels and props with pre-assembled prop heads. Only two workers are needed for assembly and stripping even for large slab areas as in this case. Crane time is not required. Since the set up is fool-proof and thus virtually error-free, this adds to site safety.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • Balancing act between creativity and technological feasibility

    Balancing act between creativity and technological feasibility

    Complex geometries and exacting requirements constantly present MEVA’s Special Design department with exciting tasks – during the renovation of a church in the Upper Bavarian village of Hebertshausen, for example.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.